Company Details
  • Weifang Choice-Link Trading Co., Ltd

  •  [Shandong,China]
  • Business Type:Manufacturer , Trade Company
  • Main Mark: Africa , Americas , Asia , Europe , Middle East , North Europe , Worldwide
  • Exporter:11% - 20%
  • Certs:ISO9001, ISO9000, ISO14001, OHSMS
  • Description:Rubberized Asphalt,Non-cured,Waterproofing Coating
Weifang Choice-Link Trading Co., Ltd Rubberized Asphalt,Non-cured,Waterproofing Coating
Home > Products > Waterproofing Coating > for roof double component PU waterproofing coating

for roof double component PU waterproofing coating

Share to:  
    Payment Type: L/C,T/T
    Incoterm: FOB
    Min. Order: 1000 Kilogram
    Delivery Time: 15 Days

Basic Info

Model No.: polyurethane

Advantege: High Tensile,good Elongation

Color: As Customized

Application Method: Blade Coating/spray Coating

Standard: GB/T19250-2013

Composition: Polyurethane

Classification: One Component

Application: Edible Pool,water Pipes

Additional Info

Packaging: 20KG, plastic buckets packaging, OEM Available

Productivity: 100000

Brand: kunteng

Transportation: Ocean

Place of Origin: Shandong,China

Supply Ability: 100000

Certificate: ISO,SGS

Product Description

product description

for roof double component PU Waterproofing Coating


2-23 waterproofing coating

Feature:

  • The time of drying and curing is two times as fast as general single-part PU Waterproofing coating,which could greatly shorten the construction stage.
  • Because of the more scientific and precise control of dynamic viscosity,little deposit is produced so that substantially reducing the waste of coating deposit.

Applicable Scope:

undefined

For important waterproof engineering,edible pool,aquaculture,special pool,swimming pool,water pipes,with requirements of environmental protection waterproof engineering on groundwater,etc.

construction process

undefined
  • Coating construction is generally 3-4 times,scraping and coating on the base course evenly with a rubber scraper or bristle brush after stirring.The first time coating film should be thin in order to prevent bubbling.
  • The construction protect layer must be done upon coating thickness has met the design requirement and gained acceptance.
  • Coating can be carrying on as soon as the prior film is non-stick.
  • In order to cohering the waterproof layer and other materials,you can add some coarse sand before the last coating becoming non-sticky under facade construction.
packing transport

3-02 waterproofing coating

  • The products should be sealed storage in ventilated and shade place.Keep away from fire.Prevent sun and rain during transportation.
  • It must be stored in cool ,dry and venytilated space
  • Avoid raining,insolating,squeezing and colliding during transportation to save the packaging.

other products

waterproof-2


----------------------------------------------------------------------------------

1



Looking for ideal Rubberized Asphalt Manufacturer & supplier ? We have a wide selection at great prices to help you get creative. All the Non-cured are quality guaranteed. We are China Origin Factory of Waterproofing Coating. If you have any question, please feel free to contact us.

Product Categories : Waterproofing Coating

Product Images
  • for roof double component PU waterproofing coating
  • for roof double component PU waterproofing coating
  • for roof double component PU waterproofing coating
  • for roof double component PU waterproofing coating
  • for roof double component PU waterproofing coating
Email to this supplier
  • *Subject:
  • *Messages:
    Your message must be between 20-8000 characters
Copyright © 2018 Weifang Choice-Link Trading Co., Ltd All rights reserved.
Communicate with Supplier?Supplier
Colin Mr. Colin
What can I do for you?